Candidate No: 1147

Jalan Tropika,Malaysia

About Me

Having more than 25 years working experience, out of that is 21 years of QA/QC experience in the oil and gas industry as a quality practitioner Having extensive project quality management and auditing experience and used to register with IRCA, London. Have performed various and multiple audits on companies locally and abroad in addition to internal audits during the Design and Execution phases of the projects involved. Among the external parties audited were design office, manufacturers, fabricators and suppliers locally and abroad (Japan, China, Norway, Singapore, Indonesia and Sudan) Certified Quality Manager by ASQ and FMM Graduated with B.Eng.(Hons) Mechanical Engineering from University of Liverpool, United Kingdom JIS Certified Welding Engineer and used to hold CSWIP 3.1 welding inspection certificate Have worked and/or engaged with major multinational oil and gas companies such as EPMI, JGC, CHIYODA, CNPC, CPECC, KBR, SUDAPET, PETRONAS and SHELL. Involved in various mega projects in the oil and gas sector locally and abroad. Well versed with ISO9000 series of standards, familiar with government regulation such as FMM DOSH requirements and have sound knowledge of several construction codes e.g. ASME IX, II, V, VIII, B31.3, API 1104, 6A, 6D, 650,AWS D1.1, PTS, DEP/SES etc.

Experiences

QA/QC Manager

Worked as a QA/QC Manager at Awatra Sdn Bhd (Seconded to PCSB) Kasawari CCS Project Job Description 1. Reports directly to the project director. 2. Accountable for organizing and directing the development and execution of QA/QC plan (e.g. Quality control, inspection, audit, documentation, etc.) to ensure that project specific quality requirement are met. 3. Accountable for ensuring the quality of the facilities conforms to PTS and Owner approved specifications. 4. Accountable for the implementation of project quality assurance program such as audits, third party reviews and management reviews. 5. Accountable for the implementation of quality campaigns including quality awareness programs, quality improvement programs etc. 6. Accountable to ensure sufficient workforce for the execution of quality control and inspection. 7. Accountable for the coordination with other discipline coordinators on the quality requirements of the project. 8. Accountable for the implementation and monitoring of QAQC programs for project. 9. Accountable for the management of the NCRs 10. Accountable for the implementation of the ITP, progress and reporting.

Year: 3rd Jan 2022-July 2024

Senior Project QA/QC Engineer

Worked as a Senior Project QA/QC Engineer at Sarawak Shell Berhad Sabah EORC Centre (EORC) ₒ Coordinated for the establishment of Project Quality Assurance Plan (PQAP) and aligned and approved Contractor’s project QMS/PQEP and monitored their implementation. Developed and executed the project Quality Audit Plan Performed external audits on Design Contractors Conducted/Coordinated QMS Quality Awareness/Training Sessions Maintained Action Tracking System and ensure proper closure of quality action items Coordinated Lessons Learnt sessions (retrieval and capturing) and followed up on action items close out Provided Quality Inputs into Invitation to Tender (ITT)/ Invitation To Bid (ITB) documents. Provided Quality Inputs to the Project Execution Plan Aligned the Project Quality Plan (PQP) to Smooth Start-Up Plan Established the project quality Key Performance Indicators (KPI) and reported the status on regular basis. Monitored Contractors’ Quality KPIs and their status. Reviewed Purchase Specifications/Technical Requisition Packages (TRPs) Reviewed and monitor Final Documentation & Records Handover

Year: December 2014 - January 2016

Senior Project QA/QC Engineer

Worked as a Senior Project QA/QC Engineer at Sarawak Shell Berhad B11 Redevelopment Project Developed the project Quality Audit Plan and participated in the project quality surveillance and audits on Contractors, Fabricators and Suppliers locally and abroad Provided quality inputs to the project’s specifications/requisitions Developed and maintained QC Procedure Participated in the Kick Off and Pre-Inspection meetings Reviewed and approved project’s procedures and plans Reviewed and monitored inspection and test status including Inspection Release Certificate issuance. Coordinated for the resource of QA/QC 3rd party inspection personnel and monitored their mobilization and demobilization and monitored Contractors’ quality performance Coordinated and monitored regulatory compliance Coordinated for the establishment of Project Quality Plan (PQP) and aligned and approved Contractor’s project QMS/PQP/ITP/Procedures and monitor their implementation. Reviewed WPS and WPQ Conducted/Coordinated Quality Awareness/Training Sessions Maintained Action Tracking System and ensure proper closure of QC action items Provided Quality Inputs into Invitation to Tender (IT)/ Invitation to Bid (ITB) documents. Involved in Contractor/Supplier’s selection and Bid Review. Provided Quality Inputs to the Project Execution Plan Provided “Quality Risks” input to the Project Risk Register Established the project quality Key Performance Indicators (KPI) and report the status on regular basis. Monitored Contractors’ Quality KPIs and their status. Reviewed Purchase Specifications/Technical Requisition Packages (TRPs) Participated in Pre-Execution Audits Monitored 3rd party inspection personnel’s inspection reports and the corresponding corrective and preventive actions Reviewed and monitored Final Documentation & Records Handover Provided Input to Project Close out Report

Year: October 2006-September 2009

Project QA/QC Engineer

Worked as a Project QA/QC Engineer at OGP Technical Services Sdn Bhd (A Petronas Company). Developed and executed the corresponding project Quality Audit Plan Performed internal and external audits locally and abroad Provided recommendations to Site or Project Manager for any QA/QC related issues. Day to day interfacing with project personnel/contractors for the effective implementation of the project QMS. Established the project’s PQP and monitor its implementation and effectiveness. Monitored and reviewed the implementation of project QMS periodically to identify and implement improvements. Monitored the status of calibration, repair and maintenance of measurement and testing equipment. Maintained records of internal non-conformance and conducted necessary follow-up to ensure satisfactory corrective and preventive actions were taken. Monitored completeness of project documentation and test packs. Reviewed and monitored implementation of project Inspection and Test Plan, Method Statements and project specific procedures. Assure timely and effective implementation of the project QA/QC activities. Performed QA/QC surveillance and audits. Involved in WPS and welders qualification process. Monitored inspection personnel’s inspection reports, performance and coordinated for any applicable corrective and preventive actions. Reviewed and monitored Final Documentation & Records Handover.

Year: April 1997-Oct 2006

QA Engineer

Worked as a QA Engineer at Sony Video Malaysia Contribute effectively in coordinating incoming parts QA/QC, departmental interface issues, suppliers’ products quality performance, quality surveillance at suppliers’ premises, in-house quality performance and follow up on action items

Year: Jul 91-Apr 1994

Certificates

Color Skin